M&S Supply Chain Partner GIST

M&S food distribution centre upgrade

Details

A lighting solution was sought by M&S supply chain partner GIST Ltd that met the demands of both food hygiene requirements and a low temperature environment.

Working with their consultant engineer Ecotronic carried out a nationwide upgrade and installation program between 2011 – 2013. This saw every M&S food distribution centre upgrade to both T5 & LED fixtures, much with intelligent control and drastically reduce CO2 emissions.